How to run projects in different currencies
A client pays in pounds, and you count in roubles and convert by eye every time. A project can be run in the client's currency from the start.
Step 1. Open the project
Working with a client from Britain? Open their project.
Step 2. Choose the currency
Go to «Settings» → «Currency» and choose £. The pound joined the rouble, euro and dollar.
Step 3. Everything in one currency
From then on the project's rate, invoice and report are in the chosen currency.
Why keep a project in the client's currency
The client pays in pounds, the contract is in pounds, the invoice is in pounds. If you keep the project in another currency, every sum has to be converted by eye and the error accumulates.
In the client's currency the figures match what he sees in the contract and in the report.
An example: a project in pounds
Example: the rate is £40, the project is 30 hours — that's £1,200. You run it in pounds from start to finish and no figure gets converted.
The client receives an invoice and a report in pounds and checks them against the contract without a calculator.
Three mistakes with currencies
Naming a price in one currency and invoicing in another. The client sees the mismatch and starts doubting the rest.
Ignoring the exchange rate. There's risk between the client's currency and your costs, and it belongs in the buffer rather than in hope that the rate stays.
Changing the project currency midway. It's better to pick it at the start and keep it to the end.
How to work out your rate with clients in different currencies
Count it in the currency you spend in. That's your real budget, and you work from it.
Then translate it into the client's currency and check that it didn't come out cheaper than you need. The rate calculation is in the calculator.
Common questions
Which currency should I count my rate in if clients differ?
In the one you spend in. The exchange rate between the client's currency and your costs is a separate risk worth covering in your margin.
Which currencies are there?
Ruble, euro, dollar and pound (£). The currency is chosen in the project settings.
Are the project currency and the header currency the same?
No. A project runs in its own currency: its rate, invoice and report use it, while in the header you look at your own money in whichever one suits you.
Next: Rate calculator, Invoice by email.