How to price a project by items before the deal

A client asks for a price, you name a number by eye and later work for less. An estimate by items turns «roughly» into a calculation.

Step 1. Split it into items

Before the deal you can price the project item by item.

Step 2. Money at your rate

The money is calculated at your rate.

Step 3. A margin on top

A margin for the unexpected is added on top.

Why an itemised estimate beats a number by eye

A number by eye is almost always too low: calls, edits and approvals get forgotten. Every item makes you recall what's hidden in it.

And it's easier for a client to agree to a price he can see in parts.

An example with numbers

Example: four items — sales 2 hours, production 3 × 8 hours, account management 3 hours, marketing 4 hours. 33 hours in all.

A +15% buffer adds 5 more hours, making 38. At €50 an hour that's €1,900. You name the price with the buffer in it, not «however it turns out».

Three mistakes in estimating

Not counting the work around the work: messaging, preparation, hunting for materials. They're items too.

Taking optimistic hours. If you're unsure, put in more: that's what the buffer is for.

Showing the client one option. Better to give several options of work: how to build them is in the page about the price menu.

After the deal

The estimate can be turned into a project with the «To project» button. Later you compare the project hours with the estimate and see where you were off.

After three or four projects the estimates get sharper and the buffer can shrink.

How to check that the price isn't too low

Divide the final price by the estimate's hours. If the result is below your rate, an item or a buffer is missing somewhere.

Example: 1,900 ÷ 38 hours = €50 an hour. If the client asks to drop it to €1,500, the rate falls to €39, and you see the cost of the concession.

It's better to give a discount by cutting the work rather than the rate: remove an item and the price drops honestly.

Common questions

How do I name the price to the client after the estimate?

Not as a range but as a menu of a few ways to do the work. How to put one together is in the guide «How to name your price without scaring the client off».

How many items do I need?

As many as the work has parts. For a small project three to five are enough; the main thing is that each item can be estimated in hours.

Is the buffer required?

That's your call. The buffer protects against revisions and approvals that don't show in the estimate, and after a few projects you can tune it to yourself.